Big Foot Rapid Walkway

The Big Foot Systems Rapid Walkway is ideal for establishing a safe path around installations on a flat roof.

The Rapid Walkway consist of a GRP top that is non-slip in any weather, supported on Big Foot Fix-it Foot 1m throughout.

Description

Big Foot Rapid Walkway

The Big Foot Systems Rapid Walkway is ideal for establishing a safe path around installations on a flat roof. The Rapid Walkway consist of a GRP top that is non-slip in any weather, supported on Big Foot Fix-it Foot 1m throughout.

For additional clearance height, the Big Foot High Bloc 1m fits underneath the Fix-it Foot, allowing the user to increase the clearance height by an additional 120mm.

FEATURES

  • Non penetrative load management.
  • Cost effective, flat packed access solution.
  • Safe non-slip GRP walkway.
  • Flexible solution, stocked in three sizes.
  • Durable recycled rubber Fix-it Foot.
  • Quick to install, robust and secure.

 

Part Number Description Length (mm) Width (mm) Height (mm) Weight (kg)
1m x 1m B9105 1000 1000 121 32
2m x 1m B9106 2000 1000 121 54
3m x 1m B9107 3000 1000 121 77
1m Handrail B9111 1000 – 1100 13
2m Handrail B9112 2000 – 1100 22
3m Handrail B9112 3000 – 1100 30
1m Corner Handrail B9104 1000 1000 1100 23

 

THE KIT INCLUDES

  • Fix-it Foot 1000 feet
  • GRP Grid
  • Assembly instructions

Brand

Big Foot Systems

Big Foot H Frame installation

Launched in 2001, Big Foot designs and manufactures outstanding support systems for rooftops and other applications. This non-penetrative load management system is very popular among building service engineers and contractors throughout the HVAC industry and is as a viable alternative to traditional timber, steel, and concrete constructions, whilst still protecting the roof's integrity.

Bigfoot are the industry leaders in rooftop load management, and design and manufacture the widest product range of support solutions. With no two roofs being the same, limited space, access, existing obstructions or lightweight roofs may require a Big Foot Systems Custom Framework.

From the initial phone call through to project completion, either Heronhill or Bigfoot’s experienced in-house technical team will plan the most effective support solution using the latest design software. To get the most cost-effective results in the fastest time, ensuring the individual requirements of your project are met, send us your drawings or project details so we can prepare a quotation accordingly.

Downloads

Big Foot Rapid Walkway datasheet

Related Items

Case Studies

These are just some
of our recent projects

Accreditations

We are proud members of these organisations

Accreditation-Logo-1
HEVAC-Logo+Strapline 2024
FETA Humidity Control Group logo
Accreditation-Logo-4
Accreditation-Logo-5
Accreditation-Logo-6